How we plan building engineering.

Our engineers walk rounds and log readings. Planned preventive maintenance puts every piece of equipment on a register, rates each task and sets the schedule those rounds follow.

Example equipment register
Units5Tasks1614Tasks this month3Work orders this visit5
UnitObservationsStatus
Emergency generatorStarts on test, operableSurveyed
Backflow preventerTagged, annual test dueSurveyed
Rooftop unit RTU-1Dirty coil, belts wornSurveyed
Booster pumpNormal pressure, quietSurveyed
Server room cooling unitKeeps the server room onlineSurveyed
Emergency generator3 tasks
  • Run under load5 stepsCritical
    1. Check fuel, oil and coolant levels
    2. Start the generator and bring it up to load
    3. Record voltage, frequency and run time
    4. Watch for leaks, smoke or alarms
    5. Return it to standby and log the run
  • Battery and charger check4 stepsImportant
  • Fuel sample and tank check4 stepsRecommended
Backflow preventer2 tasks
  • Annual test5 stepsCritical
    1. Tell the building before the water is shut off
    2. Connect the test kit and record each reading
    3. Compare the readings to the pass limits
    4. Tag the device and restore the water
    5. File the test report
  • Leak and valve check3 stepsRecommended
Rooftop unit RTU-14 tasks
  • Smoke detector shutdown test4 stepsCritical
  • Filter and belt change6 stepsImportant
  • Condenser coil cleaning5 stepsRecommended
    1. Lock out the unit and put on the required protective gear
    2. Protect the surroundings and apply the approved coil cleaner
    3. Rinse the coil and check for clear airflow across the full face
    4. Put the guards back and photograph the cleaned coil
    5. Clean up and dispose of the rinse water to site rules
  • Thermal scan of electrical connections4 stepsPremium
Booster pump3 tasks
  • Look, listen, log the reading5 stepsRecommended
    1. Check suction and discharge pressure
    2. Listen for bearing or cavitation noise
    3. Feel the motor for heat and vibration
    4. Look for leaks at seals and fittings
    5. Log the readings
  • Motor amp reading3 stepsImportant
  • Coupling and alignment check4 stepsRecommended
Server room cooling unit4 tasks
  • Filter change3 stepsImportant
  • Condensate drain and pan check4 stepsRecommended
  • High temperature alarm test3 stepsRecommended
  • Extra coil and filter service5 stepsPremium
    1. Confirm the room can run on backup cooling
    2. Shut down and lock out the unit
    3. Change the filters and rinse the coil
    4. Restart and confirm the supply temperature
    5. Log readings and photos

5 units, 16 tasks in all. Open any one to see its tasks and steps.

UnitEvery roundMonthly12 visits a yearQuarterly4 visits a yearAnnual1 visit a year
Emergency generatorRun under loadBattery and charger checkFuel sample and tank check
Backflow preventerLeak and valve checkAnnual test
Rooftop unit RTU-1Filter and belt changeSmoke detector shutdown testCondenser coil cleaningThermal scan of electrical connections
Booster pumpLook, listen, log the readingMotor amp readingCoupling and alignment check
Server room cooling unitHigh temperature alarm testFilter changeCondensate drain and pan checkExtra coil and filter service
Example budget$12,000 a yearPlan price$14,600$13,400$12,400$11,800Over budgetFits the budget
TasksTwo premium tasks held for later16 tasks 14 tasks
TimeMinutes trimmed on recommended tasks46 hours a year 40 hours a year
FrequencyOne recommended task movedQuarterly Twice a year

Critical tasks stay on.

How far it goesHow we rate each taskTasks
CriticalMust be done. We don't compromise on it.3
ImportantShould be done. Protects the equipment.7
RecommendedWorth doing. Prevents problems later.14
PremiumFor taking the best possible care of it.16
Work orderTaskLinked toStatus
WO-1041Run under loadEmergency generatorServiceChannelOpenDone
WO-1042Annual testBackflow preventerCorrigoProOpenDone
WO-1043Filters and beltsRooftop unit RTU-1ServiceTitanOpenDone
WO-1044Look, listen, log the readingBooster pumpMaintainXOpenDone
WO-1045Extra coil and filter serviceServer room cooling unitServiceChannelOpenDone
TaskWhat the year showedNext year
Run under loadEmergency generatorAs expectedMonthly
Annual testBackflow preventerAs expectedAnnual
Filters and beltsRooftop unit RTU-1Filters loading up earlyQuarterly Monthly
Look, listen, log the readingBooster pumpAs expectedEvery round
Extra coil and filter serviceServer room cooling unitAs expectedQuarterly
Example only. Your register lists your own property.

Six steps, in order.

Each step leaves a record. Scroll to watch an example fill in.

  1. Register the equipment

    We list the mechanical, electrical, plumbing and life-safety equipment in the building. The register is kept in M5's own system, and you get a login to it.

    Record:Equipment register
  2. Rate the tasks

    Each piece of equipment gets its tasks. Most have several, and each task has written steps our team follows. Each task gets one of four ratings: critical, important, recommended or premium. Work required by code or law is critical.

    Record:Rating for each task
  3. Set the schedule

    How often a task is done follows its rating. The manufacturer's manual is one input. How much the building depends on that equipment is the other.

    Record:Maintenance schedule
  4. Choose how far the plan goes

    The proposal shows what each rating covers. You can stop at critical work or go all the way through premium. Tell us your budget and we show what it covers. We fit the plan to it by adjusting which tasks are in, the time on each task and how often it runs. Critical tasks stay on. Premium is best kept for mission-critical equipment: the one piece that keeps everything in the building running and your business online.

    Record:Proposal
  5. Engineers do the work

    A stationary engineer does scheduled tasks during daily rounds. A roving engineer does them on a route of scheduled visits. Both log each task as it is done.

    Record:Round and visit logs
  6. Review the plan every year

    Readings and findings go on the record for that equipment. Once a year we review the plan with you. We go through the reports, the findings and the past work orders, then adjust the tasks, the schedule and the price for the year ahead. Each year the plan fits the property more closely.

    Record:Annual review

What goes on the register.

The equipment our engineers look after, by system.

No.SystemEquipment
1HVACRooftop units, air handlers, split systems, exhaust fans
2Boilers and chillersBoilers, chillers, water loops
3Pumps and plumbingBooster pumps, circulators, fixtures, backflow preventers
4ElectricalPanels, lighting controls
5Life-safety equipmentGenerators, transfer switches, emergency lighting
6Building automationSchedules, setpoints, alarms, trend logs

Questions

We keep calling in the same repairs. Can that become a plan?
Yes. We look at the work orders you have sent us over time and find the ones that come back on a pattern. We group them and propose a planned maintenance agreement that does that work on a schedule, before it turns into a call. Planned work can cost less than the same work called in one ticket at a time. It works for us too. The work is agreed for a few years, so we can plan our crews around it.
What happens when a task is bigger than one engineer?
Your account manager sends the rest of the team. Each property has one account manager, and our staff are trained and certified across the trades.
Does this work for a building without a full-time engineer?
Yes. A roving engineer does the scheduled tasks on a route of visits and logs each one.
Do we have to change work order systems?
No. The register is kept in M5's system. Work orders stay in the system you already use, such as ServiceChannel, CorrigoPro, ServiceTitan or MaintainX.

The process for our other services.

Tell us about your building.

Call or send a work order. For recurring work we walk the property first, then price it as a fixed monthly agreement or a quoted scope.