(925) 232-1719 Submit a work order

How we plan facility work.

Most facility work arrives as a ticket. Planned preventive maintenance puts the recurring work in the same queue, so it is scheduled before something fails.

Example asset register
Items5Tasks1715Tasks this month3Work orders this visit5
UnitObservationsStatus
Exit and emergency lightsTwo units need batteriesSurveyed
Rooftop unitDirty coil, operableSurveyed
Roll-up doorNoisy track, operableSurveyed
Parking lot lightsOne pole outSurveyed
Server room cooling unitKeeps the server room onlineSurveyed
Exit and emergency lights3 tasks
  • Test5 stepsCritical
    1. Press the test button on each unit
    2. Confirm the lamps light and stay on
    3. Note any unit that fails or dims
    4. Replace failed batteries or lamps
    5. Log the test
  • Annual full-duration test4 stepsCritical
  • Clean lenses and housings2 stepsPremium
Rooftop unit4 tasks
  • Smoke detector shutdown test4 stepsCritical
  • Filter and belt change6 stepsImportant
  • Condenser coil cleaning5 stepsRecommended
    1. Lock out the unit and put on the required protective gear
    2. Protect the surroundings and apply the approved coil cleaner
    3. Rinse the coil and check for clear airflow across the full face
    4. Put the guards back and photograph the cleaned coil
    5. Clean up and dispose of the rinse water to site rules
  • Thermal scan of electrical connections4 stepsPremium
Roll-up door3 tasks
  • Track and hardware check5 stepsRecommended
    1. Run the door up and down and watch its travel
    2. Check tracks, rollers and fasteners
    3. Lubricate as the manufacturer directs
    4. Test the safety edge and stops
    5. Log the findings
  • Spring and cable check4 stepsImportant
  • Operator and limit test3 stepsImportant
Parking lot lights3 tasks
  • Lot walk at dusk5 stepsRecommended
    1. Walk the lot after the lights come on
    2. Note every pole and fixture that is out
    3. Check photocells and timers
    4. Report damage to poles or bases
    5. Log the outages for repair
  • Lamp and driver replacement4 stepsRecommended
  • Clean lenses2 stepsPremium
Server room cooling unit4 tasks
  • Filter change3 stepsImportant
  • Condensate drain and pan check4 stepsRecommended
  • High temperature alarm test3 stepsRecommended
  • Extra coil and filter service5 stepsPremium
    1. Confirm the room can run on backup cooling
    2. Shut down and lock out the unit
    3. Change the filters and rinse the coil
    4. Restart and confirm the supply temperature
    5. Log readings and photos

5 items, 17 tasks in all. Open any one to see its tasks and steps.

UnitMonthly12 visits a yearQuarterly4 visits a yearAnnual1 visit a year
Exit and emergency lightsTestAnnual full-duration testClean lenses and housings
Rooftop unitFilter and belt changeSmoke detector shutdown testCondenser coil cleaningThermal scan of electrical connections
Roll-up doorTrack and hardware checkOperator and limit testSpring and cable check
Parking lot lightsLot walk at duskLamp and driver replacementClean lenses
Server room cooling unitHigh temperature alarm testFilter changeCondensate drain and pan checkExtra coil and filter service
Example budget$12,000 a yearPlan price$14,600$13,400$12,400$11,800Over budgetFits the budget
TasksTwo premium tasks held for later17 tasks 15 tasks
TimeMinutes trimmed on recommended tasks46 hours a year 40 hours a year
FrequencyOne recommended task movedQuarterly Twice a year

Critical tasks stay on.

How far it goesHow we rate each taskTasks
CriticalMust be done. We don't compromise on it.3
ImportantShould be done. Protects the equipment.7
RecommendedWorth doing. Prevents problems later.13
PremiumFor taking the best possible care of it.17
Work orderTaskLinked toStatus
WO-1041TestExit and emergency lightsServiceChannelOpenDone
WO-1042Coil cleaningRooftop unitCorrigoProOpenDone
WO-1043Track and hardware checkRoll-up doorServiceTitanOpenDone
WO-1044Lot walk at duskParking lot lightsMaintainXOpenDone
WO-1045Extra coil and filter serviceServer room cooling unitServiceChannelOpenDone
TaskWhat the year showedNext year
TestExit and emergency lightsAs expectedMonthly
Coil cleaningRooftop unitAs expectedAnnual
Track and hardware checkRoll-up doorTrack drifting between visitsQuarterly Monthly
Lot walk at duskParking lot lightsAs expectedMonthly
Extra coil and filter serviceServer room cooling unitAs expectedQuarterly
Example only. Your register lists your own property.

Six steps, in order.

Each step leaves a record. Scroll to watch an example fill in.

  1. Register what we maintain

    We list the doors, lighting, plumbing, HVAC units and common areas we look after at the property. The register is kept in M5's own system, and you get a login to it.

    Record:Asset register
  2. Rate the tasks

    Each item gets its tasks. Most have several, and each task has written steps our team follows. Each task gets one of four ratings: critical, important, recommended or premium. Work required by code or law is critical.

    Record:Rating for each task
  3. Set up recurring work orders

    Planned tasks become recurring work orders. We work in ServiceChannel, CorrigoPro, ServiceTitan and MaintainX, and by email or phone for properties that don't use a portal.

    Record:Recurring work orders
  4. Choose how far the plan goes

    The proposal shows what each rating covers. You can stop at critical work or go all the way through premium. Tell us your budget and we show what it covers. We fit the plan to it by adjusting which tasks are in, the time on each task and how often it runs. Critical tasks stay on. Premium is best kept for mission-critical equipment: the one piece that keeps everything in the building running and your business online.

    Record:Proposal
  5. Work every ticket the same way

    Your account manager assigns the tech and posts an ETA. You get updates from the field. We close the ticket with before and after photos.

    Record:Closed ticket with photos
  6. Review the plan every year

    What the tech finds goes on the record. Once a year we review the plan with you. We go through the reports, the findings and the past work orders, then adjust the tasks, the schedule and the price for the year ahead. Each year the plan fits the property more closely.

    Record:Annual review

What goes on the register.

The parts of a property our facility techs look after.

No.AreaItems
1Doors and hardwareRoll-up doors, door closers, locks
2LightingPole lights, wall packs, emergency and exit lights
3HVACRooftop and split systems, thermostats and controls, coils and condensers
4PlumbingDrains, fixtures, sump and lift stations
5Exterior and common areasParking lots, trash enclosures, signage and bollards

Questions

We keep calling in the same repairs. Can that become a plan?
Yes. We look at the work orders you have sent us over time and find the ones that come back on a pattern. We group them and propose a planned maintenance agreement that does that work on a schedule, before it turns into a call. Planned work can cost less than the same work called in one ticket at a time. It works for us too. The work is agreed for a few years, so we can plan our crews around it.
Can planned work run in our portal?
Yes. We work in ServiceChannel, CorrigoPro, ServiceTitan and MaintainX. Planned tasks show up there as work orders, next to your other tickets.
Who owns the tickets at my property?
Your account manager. Each property has one.

The process for our other services.

Tell us about your building.

Call or send a work order. For recurring work we walk the property first, then price it as a fixed monthly agreement or a quoted scope.